Target Industry Solution

Bio-Polymer Dust Suppressants for Oil & Gas Drill Sites & Access Roads

You don't have time for failed hydroseeding jobs or EPA fines. We engineered this strictly for Oilfield Civil Contractors & Basin Site Managers who need total SWPPP compliance and zero callbacks.

Key Specifications for Oilfield Civil Contractors & Basin Site Managers

Mitigates fugitive PM10 & PM2.5 dust emissions
Resists heavy truck wheel-shear disruption
Non-corrosive to iron, steel, and transport equipment
Hydrophobic anti-foaming yields maximum water truck payload

Your Application Rates by Terrain & Slope

Don't guess on your spray rates and risk a blowout. Use the exact loading formula below to lock down your site based on your specific terrain.

Terrain & Slope Gradient GreenTack Tackifier Rate ViscoLok EFM Rate Functional Longevity
Flat Pad & Perimeters (< 4:1) 15 – 25 lbs / acre 1,500 lbs / acre 3 – 6 Months
Moderate Slope Cuts (3:1 to 2:1) 25 – 40 lbs / acre 2,500 lbs / acre 6 – 12 Months
Severe Cut Banks (1:1 and Steeper) 40 – 60 lbs / acre 3,500 – 4,000 lbs / acre 12 – 18+ Months

Equipment & Hydroseeder Rig Setup

Pump Type: Mechanical gear or centrifugal high-solids pump (Finn, Bowie, Apex).
Nozzle Selection: Wide-fan ribbon nozzle for slope coverage; narrow-smooth bore for distance.
Agitation Benchmark: 5–8 minutes mechanical agitation before discharge.