CIVIL & INFRASTRUCTURE
DOT and utility projects require erosion control. Pinning Rolled Erosion Control Blankets (RECBs) by hand burns labor, puts crews at risk on steep slopes, and bottlenecks your critical path.
SPECIFICATION: LIQUID ARMOR
STRUCTURAL COMPARISON
Legacy Manual Rollouts
Trenching and pinning take time. Water undercuts rigid mats and causes hidden washouts. Crews face serious risks on steep 1:1 slopes.
SPEED: Miles per Week
OHRA Applied Matrix
Our hydro-applied armor matches the shear strength of a physical blanket. A two-man crew applies it from the road. The matrix cures into a solid crust that contours to the soil and stops undercutting.
SPEED: Miles per Day